The Shift Box

Turning the OD This part started out on the lathe with two opperations. The first was to cut the initial contour.

Turning the OD The second was to flip the part around and cut a c'bore on the backside. Then it went to the mill to square it up and drill some holes.

The part and the electrode ready to EDM This part was finished off on the Sinker EDM by adding the square cornered slots that will lock the shift lever in place and keep the tranny in gear.

The sinker burning away! The sinker burning away!

The sinker burning away! The sinker burning away!

The finished slots This picture shows the finished slots. As you might have noticed, the electrode was rotated 90 degrees for one of the slots.


PREVIOUS  | NEXT





All contents of this site are Copyright © 1999-2003 Marks Custom Stuff All rights reserved.